Skip to main content

Network Instructions Manual

Generation, Transmission/ Substation and Distribution Manual

FI Introduction and Definitions.pdf

FI 1.1 Field Instruction Preparation Procedure.pdf

FI 1.2 Contractor Authorisation Process.pdf

FI 1.3 Construction site access minimum requirements.pdf

FI 1.4 Reference Material list.pdf

FI 2.1 Glove Protection.pdf

FI 2.2 Head Protection.pdf

FI 2.3 Inspection of Fall Protection Equipment.pdf

FI 2.4 Fire Precautions for Field Work.pdf

FI 2.5 Other Protection equipment.pdf

FI 2.6 Worksite Clothing PPE Requirements.pdf

FI 2.7 Safety Requirements when Working from an EWP.pdf

FI 2.8 Pole Top Rescue.pdf

FI 2.9 Provisional Emergency and Evacuation Procedures.pdf

FI 2.10 Removal of Electrical Equipment Containing Asbestos.pdf

FI 2.11 Use of Mobile Phones.pdf

FI 2.12 Oversize Load Vehicle Escorts.pdf

FI 2.13 Vehicle and Plant Earthing Requirements.pdf

FI 2.14 Working in the Vicinity of Electrical Storms.pdf

FI 2.15 Temporary Safety Barriers and or Warning Signs.pdf

FI 2.16 Construction Authority Work Permit.pdf

FI 2.17 Safe Approach Distances.pdf

FI 2.18 Access to Pilot Cable Boxes in Substations.pdf

FI 2.19 Pyrolysis in Vehicle Tyres.pdf

FI 2.20 Traffic Management.pdf

FI 2.21 Damaged or Unserviceable Steel Standard Streetlights.pdf

FI 2.22 Network Notifiable Incident – Evidence and Evidence Collection.pdf

FI 2.23 Job Hazard and Risk Assessment (JRA).pdf

FI 2.24 Transmission Substation (Switchyard) and Distribution Assets (Lockable) Entry.pdf

FI 2.25 Test before Touch Prior to Commencement with Work.pdf

FI 2.26 Instruments - Testing and Calibration.pdf

FI 2.27 Safety Observer Role.pdf

FI 2.28 Use of a Hydraulic Pole Tamper.pdf

FI 2.29 Single Person Tasks.pdf

FI 2.30 Horizon Power assets in the vicinity of Hazardous areas.pdf

FI 2.31 Emergency Situations.pdf

FI 2.32 Dangerous and Explosive Goods.pdf

FI 2.33 Objects Suspected of Unexploded Ordnance in Origin.pdf

FI 2.34 Safe Driving on Unsealed Roads.pdf

FI 3.1 Designating a Construction Site.pdf

FI 3.2 Bulk Fuel Management.pdf

FI 3.3 Tank Inspection and Maintenance.pdf

FI 3.4 Lockable Isolation Device.pdf

FI 3.5 Oil Sampling.pdf

FI 3.6 Connecting Standby Generators to Substation AC Power Supply.pdf

FI 3.7 Maintenance of Remote Community Generation Systems.pdf

TS 4.1 Substation Entry Requirements.pdf

TS 4.2 Site Security.pdf

TS 4.3 Substation Clearances.pdf

TS 4.4 Secondary Isolations.pdf

TS 4.5 Dogging – Transmission Substation.pdf

TS 4.6 Rigging.pdf

TS 4.7 Pitch Removal.pdf

TS 4.8 Transmission – Handover Certificates.pdf

TS 4.9 Unauthorised Access.pdf

TS 4.10 Electrical Substation Insulator Washing.pdf

TS 4.11 Pilot Protection Systems.pdf

TS 4.12 Batteries and Battery Chargers.pdf

TS 4.13 Excavation and Directional Drilling.pdf

TS 4.14 Substation Permits.pdf

FI 5.1 Erection of Conductive Poles through Live Low Voltage Conductors.pdf

FI 5.2 Poles – Inspection and Support Prior to Commencement of Work.pdf

FI 5.3 Reinforcement of Wood Poles.pdf

FI 5.4 Testing and Use of High Voltage Insulated Equipment.pdf

FI 5.5 Portable Ladders.pdf

FI 5.6 Removal of Poles Embedded in the Ground.pdf

FI 5.7 Installation of Spreader Rods to Bare Live Low Voltage Conductors.pdf

FI 5.8 Handling and Transporting Loads.pdf

FI 5.9 Fire Hydrant Signs on Horizon Power Poles.pdf

FI 5.10 Stringing Tensioning and Sagging Conductors.pdf

FI 5.11 Conductor Clearances.pdf

FI 5.12 Working on Pole Top Switching with One Side Live.pdf

FI 5.13 Notifying Telstra of a New HV Earth Installation.pdf

FI 5.14 Height Safety.pdf

FI 5.15 Requirements for Low Voltage Overhead Work.pdf

FI 5.16 Continuous Neutral on the LV Network.pdf

FI 5.17 Pole and Tower Failures.pdf

FI 5.18 Distribution Transformer and LV Feeder Load Readings.pdf

FI 5.19 Tensioning Aerial Bundle Cable.pdf

FI 5.20 Cutting A-Frame Steel Rail Poles.pdf

FI 5.21 Supporting Live HV Distribution Conductors using a Crane.pdf

FI 5.22 Stringing Optic Fibre Conduit.pdf

FI 5.23 Soil Compaction Testing Requirements.pdf

FI 5.24 Restriction in the Use of Zone Substation Isolators.pdf

FI 5.25 Repetitive Fuse Operation Complaints.pdf

FI 5.26 Private Parallel Generators – General Operating Guidelines.pdf

FI 5.27 Pole to Pillar – ABC Connection.pdf

FI 5.28 Maintenance of Down Earth Assemblies on Poles.pdf

FI 5.29 Installation of Hazard Identification Warning Markers to Overhead Power Lines from a Water Vessel.pdf

FI 5.30 Installation of Line Crossover Gantries near Live Overhead Distribution Lines.pdf

FI 5.31 Scaffolding.pdf

FI 5.32 Steel Pole Assembly.pdf

FI 5.33 Dogging and Rigging.pdf

FI 6.1 Work Adjacent to Gas Mains.pdf

FI 6.2 Low Voltage Cable Work.pdf

FI 6.3 Commissioning of Low Voltage UDS Cables.pdf

FI 6.4 Excavation Work and Directional Drilling.pdf

FI 6.5 Live Low Voltage Cable Jointing and Working on Live LV Apparatus.pdf

FI 6.6 Commissioning of High and Low Voltage Cables and Apparatus.pdf

FI 6.7 Live LV Underground Pits.pdf

FI 6.8 Identifying and Proving of HV Cables.pdf

FI 6.9 Underground Cables.pdf

FI 6.10 Cable Installation.pdf

FI 6.11 Proving the Status of LV Underground Cables.pdf

FI 6.12 Blank Instruction.pdf

FI 6.13 Ferro Resonance in the Underground Distribution System.pdf

FI 6.14 Storage Handling Transport and Disposal of Sulphur Hexafluoride SF6 Gas.pdf

FI 6.15 Degassing of XLPE Cables.pdf

FI 6.16 Blank_Instruction.pdf

FI 6.17 Safety Procedures for HV and LV Cable Work.pdf

FI 6.18 Blank Instruction.pdf

FI 6.19 Repairing Damaged or Faulty Low Voltage Underground Electrical Apparatus.pdf

FI 7.1 Customers’ Electrical Equipment.pdf

FI 7.2 Changing and Removing KWH Meters and Service Cables.pdf

FI 7.3 Sealing of Metering Equipment.pdf

FI 7.4 Blank Instruction.pdf

FI 7.5 Testing Low Voltage Service Connections.pdf

FI 7.6 Spliced Neutral Service Connections.pdf

FI 7.7 Customer disconnection for Building Demolition.pdf

FI 7.8 Installation and Replacement of Service Cables.pdf

FI 7.9 Fitting of Service Fuses.pdf

FI 7.10 Customer Installation - De-energise Re-energise.pdf

FI 7.11 Meter Reader.pdf

FI 7.12 Polarity Testing of Un-Metered supplies in Underground Pits.pdf

FI 7.13 Advanced Metering Infrastructure - Communication Devices - Polarity Testing.pdf

FI 7.14 Advanced metering infrastructure - Communication device - Network Interface Card (NIC).pdf

FI 7.15 Fixing Requirements for Utility Meters and Panels.pdf

FI 8.1 Portable Earthing Requirements.pdf

FI 8.2 Expulsion Drop-Out Fuse Barrel Inspection and Fuse Rating Requirements.pdf

FI 8.3 Induced Voltage.pdf

FI 8.4 Construction or Commissioning in Operational Switchyards.pdf

FI 8.5 Use of Portable Equipotential Mat for Switching.pdf

FI 8.6 Switching Authorisation.pdf

FI 8.7 Blank Instruction.pdf

FI 8.8 Connecting Standby Generators to Substation AC Power Supply.pdf

FI 8.9 Blank Instruction.pdf

FI 8.10 Ground Mounted High Voltage Fuses with Uni-Rupter.pdf

FI 8.11 HPCC Requirements for a Feeder Outage Where Feeder Protection is Suspect.pdf

FI 8.12 Installation and Connection of Radio Switching Units RSU to LV Aerial Mains.pdf

FI 8.13 Zone Substation Transformer Overload.pdf

FI 8.14 Transformer Overload.pdf

FI 8.15 Blank Instruction.pdf

FI 8.16 Paralleling of Zone Substation Transformers.pdf

FI 8.17 Operating Agreement Permit.pdf

FI 8.18 Isolating IPP Supply to Access HV Network.pdf

FI 8.19 Feeder Reclosing Instruction for Extreme, Catastrophic & TFB Declared Days.pdf

FI 8.20 - Replacing Fuses on the HV LV Underground and Overhead Network after a Fault has Occurred.pdf

FI 8.21 Work Permits.pdf

FI 8.22 Switching Activities.pdf

FI 8.23 Load Break Switch as an Isolation point.pdf

FI 8.24 Network Tags.pdf

FI 8.25 LV Underground Infrastructure Access.pdf

FI 9.1 Leaking Distribution Transformers and or Reclosers.pdf

FI 9.2 Environmentally Sensitive Area.pdf

FI 9.3 Treated Poles.pdf

FI 9.4 Management of Soil Containing Chemicals Surrounding Removed Poles.pdf

FI 9.5 Disposal of Lamps and Fluorescent Tubes.pdf

FI 9.6 Minor Major Oil, Chemical and Fuel Spill or Leak.pdf

FI 9.7 Street Light Capacitors and Choke Boxes Containing PCB.pdf

FI 9.8 Controlled Waste.pdf

FI 9.9 Aboriginal Heritage Assessment for New Land.pdf

FI 9.10 Heritage Assessment Prior to Working on Existing Infrastructure.pdf

FI 9.11 Native Title Legislation and Land Acquisition.pdf

FI 9.12 Compliance with Aboriginal Heritage Legislation.pdf

FI 9.13 Identifying Objects of Aboriginal Origin.pdf

FI 10.1 Native Vegetation Clearing.pdf

FI 10.2 Vegetation Management and Weed Control in Substations.pdf

FI 10.3 Specialised Insulated Plant for Vegetation Management.pdf

FI 10.4 Tree Felling.pdf

FI 10.5 Pole Base Clearing.pdf

FI 10.6 Vegetation Management Work.pdf