Connect solar, battery or other renewables

Everything you need to know if you're an installer or electrical contractor applying to connect a renewable energy system in regional WA.

With over 38 unique energy systems to manage, network stability is vital to delivering safe and reliable power across all communities. That's why our engineers need to consider any load impact on our micro-grids by assessing all Distributed Energy Resource (DER) system connections before installation - to ensure they comply with our Technical Requirements.

Here's everything you need to know to apply to connect a renewable energy system to the network.

 

All new connections will be energy managed with Smart Connect Solar


As more renewables connect to the network, it becomes harder to maintain a stable power supply.  Smart Connect Solar means more rooftop solar can be connected without impacting network stability.

Most systems will need to be energy managed via a Secure Gateway Device connected to Horizon Power's DER Management system (DERMS).



 

What you need to know

Technical Requirements for Basic EG Systems - outlines compatible inverters, internet connection options and how to commission Horizon Power's SGD during install. Download or learn more.

Technical Requirements for Low Voltage EG systems - have been updated to facilitate the new DERMS requirements and SGD supplied by Horizon Power. Download or learn more.

Inverters - for Basic EG connections, only select inverter makes and models are initially compatible with the SGD (supplied by us). This list will continue to grow as more inverters become compatible. 

Training - to install Smart Connect Solar, you'll need to complete our new Solar Accreditation Australia (CPD113) micro-accreditation.

About Smart Connect Solar

 

Technical requirements, schedules & assessments

The Basic Micro EG Connection Technical Requirements or Low Voltage EG Connection Technical Requirements specify the minimum technical requirements for customers connecting renewable energy to our networks. You cannot proceed with any installation until you have received approval from Horizon Power in writing. 

 

View all Technical Requirements

Stay up to date on solar updates, products & trials

Are you a:
An error has occurred while getting captcha image

Request to connect a renewable energy system to the network

It only takes around 5 to 10 minutes to complete - we'll let you know if there's available capacity along the way.

Stay in touch

Leave your details to get updated on solar releases or find out how to contact us.

 

Contact us Register for updates

Horizon Power acknowledges the Traditional Custodians throughout Western Australia and their continuing connection to the land, waters and community. We pay our respects to all members of the Aboriginal communities and their cultures; and to Elders past, present and emerging.

Aboriginal and Torres Strait Islander people are advised that this website may contain images, names or voices of deceased people.